Traditional engineering economic analysis uses estimated parameters (costs, savings, interest rates).
How sensitive is our project's viability to changes in a single input parameter?
Calculate the base case PW.
Vary each key parameter (First Cost, Annual Savings, MARR, etc.) one by one.
Recalculate PW for each variation.
Plot the results.

At what value of a parameter does the project become just worthwhile (i.e., break even)