| Week | Read | Focus |
|---|---|---|
| 1 | 1.4 Performance (pp. 17–26) | Skim the rest of Ch. 1 for the short answers on history and trends |
| 2–3 | 3.3.1–3.3.2 (and 3.2 only as needed) | Hazards, forwarding, out-of-order completion, WAW in multi-cycle pipelines |
| 4 | 3.3.4, 3.4.3 | Static and dynamic prediction, two-level predictors, BTB |
| 5 | 3.3.5 | Static scheduling, loop unrolling, software pipelining |
| 6 | 3.4.1–3.4.2, then 3.4.4–3.4.6 if covered | Tomasulo, then speculation (ROB), memory disambiguation, explicit renaming (R10K) |